Covia: Safety was our priority

The scope of our work for Covia consisted of completely replacing the roof along with 75% of the structural concrete deck.

Challenges

  • – Demolition of the roofing system, creating an open-air structure
  • – Construction work more than 50 feet above an open space
  • – Removal of 326 concrete slabs over 300 pounds each
  • – Tight deadline

Outcome

  • – No impact on business operations
  • – Deadline was met
  • – Safety and security maintained throughout

Covia’s experience

“Toiture Couture’s teams performed their work in compliance with our corporate health and safety regulations, criteria that are above standard laws and regulations. They made sure that the premises were safe at all times. We are very satisfied with the work they did on our site. They proved highly professional.”

– Sylvain Gauthier, Plant Manager at Covia